Munich Technology Centre, Munich
project profile data | |
---|---|
Area: | ca. 2,500 m² |
Construction year: | 2008 |
Architect/Design: | Glück Landschaftsarchitektur, Stuttgart |
Contractor: | Garten Moser, Reutlingen |
System build-up: | “Sedum Carpet” with Floraset® FS 50 and Solar Base SB 200 |
Project report
ZinCo_Munich_MTZ.pdf989.78 KB
The Munich Technology Centre (MTZ) supports founders and young entrepreneurs from all technology sectors during the founding phase by providing suitable spaces and intensive coaching. The MTZ also offers the companies the possibility to keep the established location during the growth phase. On the 2,500 m² roof it was decided to use a photovoltaic system combined with an extensive green roof. The individual frames for the solar system were each mounted on a 1 × 2 meter Solar Base Plate SB 200 and covered with substrate. Because the solar panels were set up almost to the edge of the roof the additional fixing device Fallnet® SB 200 Rail was installed which allows for safe working in the perimeter areas.